15 minutes. Same time, same place, every working day. Three lines per person — yesterday, today, blocked. Solving happens after standup, not during. The session that holds the day; not the session that runs the project.

When ​

  • Every working day, same time. Held even when only two people show up.
  • First thing in the team's day — before deep work begins, not after lunch.

Who ​

  • Whole working team — Trio plus developers actively pulling.
  • Standing, if physical. Standing keeps the session short. Remote: same energy, no chairs comfortable enough to settle into.

Time-box ​

15 minutes. Hard limit. If the standup overruns once, it's a blip. If it overruns twice in a week, the format is broken; investigate at the next retro.

Inputs ​

  • Yesterday's work, freshly remembered.
  • The pull tracker / kanban.
  • Any blockers the team should know about.

Agenda ​

Each person, in order, three lines:

LineContent
YesterdayOne specific thing. "I finished the negative-balance scenario in PR #211." Not "I worked on grading."
TodayOne specific thing. "I'll pull the language-pack story." Not "More grading."
BlockedSpecific or none. "Need a 10-minute walkthrough with Esti on the idempotency-key approach." Not "Some stuff."

No solving. A blocker is named, not resolved in standup. The blocker-resolver pulls the affected person aside after the standup. The PO writes the blocker list as it surfaces.

Outputs ​

  • A blocker list for the day — owned by the PO.
  • A flag for the trio if any blocker crosses 24 hours unresolved.

What good looks like ​

Standup ends in 8–12 minutes. The room knows what's happening today without anyone reading the kanban. Blockers are surfaced and routed, not solved.

When a difficult question arises — "how do we handle the migration's rollback?" — the response is "let's grab Esti after standup", not a 20-minute group debate. The decision happens later, with the right people, in the right room.

Anti-pattern ​

Status report theatre. Each person reads their JIRA tickets aloud. No information emerges that isn't already in the tracker. Fix: the three lines exist to surface what's not yet on the tracker — yesterday's surprises, today's risks, blockers nobody knows about.

A second anti-pattern: standup becomes a debugging session. Two engineers fall into a technical conversation; the rest of the team waits; 20 minutes pass; standup hasn't finished. Fix: the PO calls it: "that's a great conversation — take it offline, the rest of us are 15-minute people."

A third: the PO solves blockers in standup. The PO promises to "look into it" for everything. The standup ends with seven action items on the PO. That is not standup; that is a queue forming. Fix: the PO names who owns each blocker; the PO owns only their own blockers.

See also ​

  • Canon — implicit throughout Volume IV; the cycle's day-by-day rhythm
  • Adjacent session — Three-confirmation review (the next-up sync the team holds)
  • Anti-pattern — what to do if standup drifts: A retro that listed names a similar drift in retros