200apps · how we work · volume IV of V
Execution
The prediction goes live. Domain language survives the trip from brief to code. Trunk-based flow, conventional commits, feature flags, the pipeline, the release gate, runbooks. The cycle's machinery.
200apps / NWIRE · 2026
This volume describes the Execution phase. The Volume III scope is now in motion. The trio is building, testing, integrating, releasing. The pipeline catches a different chain level at each stage. The release gate is the moment the chain steps from building to watching. By the end of this volume, the flag is enabled and Volume V's first 48 hours has begun.